Anhui Solar Panel
Location : Anhui Province , China
Application Type : Commercial
Installation Date : 2019
System Size : 200 MW
The Project
The solar power plant project in Anhui involved the installation of solar panels, inverters, and other equipment to generate electricity from sunlight. The project team sourced various materials and supplies from FRCABLE, including solar cables, connectors, junction boxes, solar clips, and mounting hooks.
The first step in the project was to conduct a site survey to assess the suitability of the location for the installation of the solar panels. The team considered factors such as the availability of sunlight, the slope of the land, and the proximity to the grid. Once the site was selected, the team began preparing the ground for the installation of the panels. This included grading the land, installing a foundation, and setting up the mounting structure.
The solar panels were then installed on the mounting structure, and the team connected them using the solar cables and connectors provided by FRCABLE. The cables were carefully laid out to ensure that they were protected from damage and did not interfere with the movement of equipment or personnel on the site.
The connectors were used to join the cables to the panels and the inverters, which were responsible for converting the direct current (DC) electricity generated by the panels into alternating current (AC) electricity, which is compatible with the grid.
Once The solar clips were used to hold the cables in place and prevent them from moving or becoming disconnected.
Finally, the team installed the mounting hooks, which were used to secure the mounting structure to the ground and provide additional stability to the entire system.
With all of the components in place and connected, the team conducted a series of tests to ensure that the system was functioning properly and was ready to be connected to the grid.
Overall, the project was a success, and the solar power plant in Anhui is now generating clean, renewable electricity for the local community. The materials and supplies provided by FRCABLE played a critical role in the success of the project, and the team is grateful for the company's support.
126+
Number of Projects
46628
kg CO2e
965000
Cable length (Km)